IT relocation: the checklist from signed lease to Monday morning

An IT relocation rarely fails over the moving weekend. It fails three months earlier, on the day the lease was signed and nobody ordered the internet line. This is the order that works, from the first week after signing to the Monday when everyone logs in again.

6 min read Written by the ITproposal team
Short answer

The connection at the new address is almost always the longest lead time. Order it as soon as the lease is signed, not when the moving date is fixed.

What costs time over the weekend is not carrying things but searching: which cable went where, which device belongs to whom, and which system still expects the old IP address.

The Monday after is not aftercare but handover. Someone walking the floor fixes in an hour what would otherwise be a week of tickets.

Three months ahead: the line and the questions for the landlord

The first action after signing is ordering the connection. A business line at a new address can take weeks to months, and if the building needs new ducting or a new entry point it slips further. The moving date will not wait for it. Ask the provider straight away what is available at the address and when they can deliver, and plan a second connection or a mobile stopgap if that date is tight.

Ask the landlord what is already there. Is there a comms cabinet, and who owns it? Where does the provider’s line enter the building, and how far is that from where your equipment will go? Is there a plant room with its own circuit and some cooling, or will it be a cupboard in the corridor? Those answers decide whether you are pulling cable or just plugging in.

Put telephony on the list too. Keeping your numbers is something you arrange with your provider, and porting has its own lead time. If your phones run through a system tied to the old address, now is the time to decide whether it moves or whether this is the moment to switch.

Two months ahead: cabling and a wifi survey at the new site

Walk the building with the fit-out plan in hand. Not the landlord’s floor plan, but the one that shows where desks, meeting rooms, printers and screens will go. Every desk that needs a wired point, every meeting room with a screen and every access point is a cable that has to be in before the floor is closed. How that fits together with the comms cabinet is covered in cabling and the server rack.

Have the wifi measured, not estimated. An empty building behaves differently from a full one, and concrete cores, glass partitions and lift shafts do not show on a drawing. A survey beforehand decides how many access points you need and where. Do it once the walls are up; a short second pass after fit-out shows whether furniture and screens changed anything.

Fit the contractor’s work into the plan. Circuits for the comms room, trunking and cooling are building works and belong in their schedule. Raise it in the last week and you will hear the electrician has no time until after the move.

Four to six weeks ahead: inventory, labels and what stays behind

List everything that hangs off a cable. Desktops, monitors, docking stations, printers, phones, the server or NAS, the firewall, switches, access points, the meeting room screen. For each: whose it is, where it is now, where it is going. That list is your plan for the weekend and your checklist for Monday.

  • Label with the destination, not the origin. “Room 2.14, desk 3” helps the movers and the technician; “John’s” helps nobody.
  • Photograph the comms cabinet and the back of every rack, with the ports visible. It saves an hour per cabinet on Sunday afternoon.
  • What is not moving goes before the move. Old PCs, screens and servers are collected, wiped and disposed of with a certificate, or they will still be in a box at the new office a year from now.

The week before: backup, IP addresses and who does what

Test a restore, not just the backup. A nightly backup running tells you little; having restored one folder and one mailbox this week tells you something. Then you know that if a server does not survive the journey, you are not falling back on hope.

Find out what depends on the old IP address. This is the trap most often missed. A new connection usually means a new public IP address, and it appears in more places than you would think: access rules at suppliers and software vendors, the VPN, a trusted location in Microsoft 365, the camera system viewed remotely. Make that list now, so that Monday is a change and not an outage.

Write down who does what and who decides. Who shuts the systems down on Friday, who calls the provider if the line is not live on Sunday, who can decide to fall back on the contingency plan? A plan without names is a wish list. And tell staff what they need to do themselves: clear desks, laptop home or in the crate, and what to try first on Monday.

The moving weekend: shut down, dismantle, rebuild, test

  • Friday afternoon shutdown. A final backup, then servers and storage shut down properly rather than pulled. Anyone still working on Friday knows the systems go offline at a fixed time.
  • Dismantle in a fixed order, cabinet by cabinet and room by room, using the inventory labels. Cables that move are coiled and bagged with their device.
  • Transport. The removals firm moves the crates and furniture; servers, storage and network kit preferably travel separately in their own packaging, with someone who knows what is inside.
  • Rebuild from the inside out: connection and firewall first, then the network and access points, then servers and storage, and only then the desks.
  • Test as if it were Monday. Testing means logging in, opening a file, printing, making a call and starting a meeting, at a few random spots in the building. Lights coming on is not a test.

If a step fails, you want to know on Saturday, not Sunday evening. So leave room on Sunday for exactly that one thing that always goes differently.

The Monday after: someone on site

Make sure someone is walking the floor on Monday morning, from the moment the first people arrive. A monitor that will not wake, a dock that does nothing, a phone ringing on the wrong handset: each is fixed on the spot in minutes, and through the service desk each becomes a ticket in a queue.

Work through the inventory as a checklist. Tick off room by room what works, and note what does not with its location. By the end of the day you know what is still open, rather than holding a list of half-memories.

And do not forget the old office. There is still a comms cabinet, still cabling, perhaps still an access point on the ceiling. What is yours comes out, what is the landlord’s stays, and the old line is cancelled only once the new one has run stably for a week.

The pitfalls that cost an IT relocation a week

  • The line is not ready. Ordered too late, or ordered for the wrong address or floor. Nothing about that can be fixed over a weekend.
  • Too few data points. The fit-out changed in the last few weeks and nobody checked whether the new desks have cable.
  • The old IP address sits in an access rule at a supplier, and on Monday finance cannot get into the package.
  • A server that has never been switched off and does not start after the journey. That is exactly why the tested restore matters.
  • Wifi that worked on paper. Without a measurement in the real building you do not know what the glass walls will do.

Where our work stops

What we do. Everything that is IT about the move: the inventory and labels, coordinating handover with the provider, measuring the wifi, the data cabling and comms cabinet, shutting down, dismantling, rebuilding and testing the equipment, changes to the firewall and access rules, being on site on Monday, and clearing the IT out of the old office, including wiping and disposing of what is not moving.

What we do not do. We are not a removals company: the crates, the furniture and moving them belong to the removals firm. And we are not a building contractor: floors, walls, electrical circuits and cooling are building works. We lay data cable and mount equipment, and we tell the contractor in good time what we need from them, but we do not do their work.

Frequently asked

Questions we get about this

The five that come up most during a move.

How far in advance should you plan an IT relocation?

Start on the day the lease is signed. The internet connection at the new address often takes weeks to months, and that is the track everything else depends on. Cabling and wifi follow once the fit-out is known, and the inventory a few weeks before the date.

Can an office IT move be done over one weekend?

For an office with desks, a network and a few servers, yes, provided the groundwork is done: connection live, cabling tested, inventory labelled. The weekend is then execution. Anything still being worked out over the weekend usually costs the Monday as well.

What should be on an IT relocation checklist?

In order: order the connection, have the new site cabled and the wifi surveyed, an inventory labelled by destination, a tested restore of the backup, a list of systems that expect the old IP address, and a test round of logging in, printing and calling. Then someone on site on the first working day.

Do you move the furniture and crates as well?

No. We are not a removals company; furniture, crates and moving them are for the removals firm. We do the IT: dismantling, moving equipment that needs extra care, rebuilding and testing. We do align the schedule with the movers so the kit does not end up under the crates.

Who sorts out power and cooling in the comms room?

That is building work and belongs to the contractor or electrician. We are not a building contractor. What we do is write down beforehand what the equipment needs, so it is in their schedule rather than coming up after the move.

Related services

Further reading

The service behind this checklist, and the two parts with the longest lead times.

Moving office? Then the plan starts now

Tell us when the lease starts and what is in the office today. We will plan back from the moving date and tell you what needs ordering this month.

Practical IT knowledge in your inbox

New guides on management, security and the workplace, written by the people doing the work. No sales talk, and you can unsubscribe in one click.

We use your address for the newsletter only. See our privacy policy.

Request a quote Call