Leased line or broadband: how to decide what a site actually needs

A leased line and business broadband can both arrive over fibre and look alike in a quote, but they are different products: one is an uncontended, dedicated circuit with a guaranteed speed and a fix time, the other a shared connection with an “up to” speed. Which one a site needs depends less on megabits than on one question: what does it cost if this line is down for a day?

7 min read Written by the ITproposal team
Short answer

A leased line is a dedicated, uncontended circuit with symmetrical, guaranteed bandwidth and a fix time in the SLA. Business broadband, even full fibre, shares capacity with other connections and promises an “up to” speed.

The decision starts with what runs over the line and what an hour offline costs at that site. For a small cloud-based office, broadband with a mobile backup is often more resilient than one expensive line without.

Start early: what is available at the address and how long installation takes often decides more than what you want. We advise on and supply the connection; the network in the ground belongs to the operator.

Leased line or broadband: what each one actually is

Fibre is the medium, not the product. Two very different services run over the same kind of fibre, and the name in the quote does not always tell you which one you are getting.

  • A leased line (often an Ethernet leased line). A circuit that is yours alone, from the exchange into your building. Bandwidth is guaranteed and uncontended, and usually symmetrical: upload is as fast as download. It comes with an SLA that includes a fix time, often around the clock.
  • Business broadband (FTTP or FTTC). You share part of the network with other connections in the street or on the business park. The speed is a maximum, and at busy times you get less. Business packages usually add better support and a static IP address, but rarely a fix time you can enforce.

So do not just ask “is it fibre?” Ask “is the bandwidth guaranteed, and what does the SLA say?” Two lines with the same headline speed can behave very differently at nine on a Monday morning.

The question that decides: what does a day offline cost?

Most connectivity decisions start with speed, and speed is rarely the bottleneck. Start with what runs over the line and what happens when it drops.

  • Telephony. If your calls go through the cloud, the phones go down with the line, unless they fail over to mobile automatically.
  • Tills and card payments. A shop without a connection often cannot take payment.
  • Systems on site. If there is a server or storage that colleagues or other offices reach from outside, upload is busy all day. That is the strongest case for a symmetrical, guaranteed line.
  • Cameras and offsite backups. These also need upload, and usually more than anyone expected.

Rule of thumb: an office that works in the cloud and can carry on over mobile for a few hours is usually well served by business broadband plus a mobile backup. A site with its own servers, many simultaneous users or customers who impose an availability target justifies a leased line, and ideally still with a second path alongside it.

What a leased line SLA really promises

The biggest difference between the two is not in the speed but in the small print. Read four things in every quote.

  • Fix time or response time. A response time says when someone looks at your fault; a fix time says when the line works again. Only the second one helps you.
  • When the clock runs. Business hours only, or evenings and weekends too. A shop that trades on Saturdays gains nothing from a fix time that starts on Monday.
  • Where the promise ends. Usually at the termination point in your building. A faulty router or a cable in your own cabinet is outside it, unless that equipment is part of the service.
  • What happens if they miss it. A service credit rarely covers the cost of a day offline. Read it as a measure of how seriously the promise is meant, not as insurance.

Broadband usually says “best effort”: the provider does its best and commits to no deadline. That is fine, as long as there is a backup next to it.

One good line or two ordinary ones

A leased line fails less often, but it does fail, for example when a digger in the street cuts the cable. A fix time on paper does not help then: the fibre has to be spliced, and that takes time.

So the question is not only which line, but also which second path. A 4G or 5G backup does not run through the same trench and is, for many sites, the simplest resilience available. A second fixed line only helps if it reaches the building by a different route and ideally a different entry point; two lines in the same duct fail together.

How to combine several lines across branches and steer traffic between them is covered in our article on SD-WAN for branch networks. For a single site, a router or firewall that fails over automatically is usually enough, plus a test that proves it actually does.

What is available at the address, and how long it takes

The choice is often made by the address rather than by you. A business park may already have fibre to the wall; in a town centre or a multi-tenant building, there may still be digging or a route through shared areas to arrange.

  • Check availability per address, not per postcode: two buildings on the same street can be served differently.
  • Allow weeks to months for a new leased line, especially if civil works or permits are involved. Ask early whether excess construction charges might apply, because they are only known after a survey.
  • Get the landlord’s wayleave in time: running a cable through the wall or into a riser almost always needs one, and it is a common cause of delay.
  • Plan an office move or a new site backwards from the line. Connectivity is often the item with the longest lead time, and a fitted-out office without it is of little use.

Six questions for every quote

  • Is the bandwidth guaranteed or a maximum, and is it symmetrical?
  • Is there a fix time in the SLA, and does it apply outside business hours?
  • Where does the SLA end, and who supplies and manages the router?
  • How does the fibre enter the building, and can a second connection take another route?
  • What is the install date, and what happens if civil works overrun?
  • What can you see of the line yourself? A view of outages, latency and packet loss turns “the internet is slow” into a fault someone can fix.

What drives the price follows from the same list: guaranteed or shared, the bandwidth, the fix time and the hours it covers, and above all how much construction is needed to reach your building.

Where our work stops

What we do. We check what is available at the address, advise on the connection that suits what the site does, and supply that connection, with a backup where it is needed. We plan the switchover so the new line is live before the old one goes, and monitor it from our management platform.

What we do not do. The fibre in the ground, the exchange and the mobile network belong to the network operator, which decides on installation, civil works and repairing a cable in the street. We do not dig, we do not apply for permits and we cannot bring forward an operator’s install date; we do report faults and follow them through until they are resolved. Building work on the premises, such as a new entry through the wall, is for a contractor.

Frequently asked

Questions we get about this

The five that come up most often.

What is the difference between a leased line and broadband?

A leased line is a dedicated, uncontended connection with guaranteed and usually symmetrical bandwidth, backed by an SLA with a fix time. Broadband, including full fibre, shares network capacity with other users and offers an “up to” speed on a best-effort basis. The difference shows up at busy times and when something breaks.

Do I need a leased line?

Usually yes if the site hosts systems others reach from outside, if many people make calls or video calls at once, or if customers hold you to an availability target. A small office that works mostly in the cloud and can carry on over mobile for a few hours is often better off with business broadband and a mobile backup.

Is a leased line always fibre?

Almost always today, but the defining feature is not the medium. It is that the bandwidth is dedicated and guaranteed, with an SLA that commits to a fix time. Full fibre broadband uses the same kind of fibre and is still a shared service.

How long does a leased line take to install?

It depends on the address. If fibre already reaches the building it can be quick; if civil works, permits or a landlord’s wayleave are needed, it can take months. Check availability per address and start with the line when you plan a move or a new site.

Do you install the fibre in the street yourselves?

No. We advise on and supply the connection and manage the switchover, but the fibre in the ground belongs to the network operator, which handles installation, civil works and repairs in the street. Building work on the premises is for a contractor.

Related services

Further reading

Where this choice connects.

Shall we check what is available at your address?

Give us the address and tell us what runs at the site. We will tell you which connection fits, what a backup adds and roughly how long installation is likely to take.

Practical IT knowledge in your inbox

New guides on management, security and the workplace, written by the people doing the work. No sales talk, and you can unsubscribe in one click.

We use your address for the newsletter only. See our privacy policy.

Request a quote Call