Request a quote
Emergency SectorsCareers About us Blog Get in touch
Technician unpacking a new laptop at a desk with a monitor and cardboard boxes, with canal houses outside the window

IMACD: install, move, add, change and dispose, and how to put it in a contract

IMACD is the line in a workplace contract that hardly anyone reads and almost everyone runs into later. It covers every workplace change where someone physically has to do something: a new starter, a team moving floors, a second monitor, a laptop that has to go. What one IMACD includes decides whether that work is in the fee or on an invoice.

6 min read Written by the ITproposal team
Short answer

IMACD stands for Install, Move, Add, Change and Dispose. It is planned work on the workplace, not a fault.

The most important agreement is what counts as one IMACD. Without that definition, every move of ten people turns into an argument about whether it is ten or one.

An IMACD is only finished once the asset register is right. And the D, disposal, is only finished with a wipe certificate per serial number.

What IMACD means

The acronym comes from end-user services, and the five letters are five kinds of work:

  • Install. Setting up a new workstation, printer or meeting room screen, connecting it and handing it over working.
  • Move. A workstation or a person relocates: to another desk, another floor or another site. Disconnecting, moving, reconnecting and testing.
  • Add. Adding something to an existing workstation: a docking station, a second monitor, a headset, or software that needs an on-site install.
  • Change. Altering a workstation’s configuration: a different role, a different profile, a replaced component that was not a fault.
  • Dispose. Removing equipment, wiping data, taking it out of management and updating the register.

Without the D it is called IMAC, long the usual form. The D was added because disposal became a step of its own under the GDPR and sustainability requirements. If you come across both, ask whether disposal sits inside the unit in this contract or not.

IMACD alongside incidents and requests

An IMACD is not a fault. Nothing is broken, the work can be scheduled and the incident SLA clock should not run on it. Logging IMACDs as incidents pollutes your fault figures and gives a desk move an urgency it does not have.

An IMACD is a kind of service request, but a particular one: the part where someone has to be on site or handle hardware. Resetting a password or granting access to a folder is a request without an IMACD. Issuing a laptop, moving a desk or mounting a screen is one. That distinction is why IMACD often sits separately in a contract: it needs people, travel time and scheduling.

What counts as one IMACD

This is the agreement that saves the most money and is written down the least. A team of ten moving floors: is that one move or ten? And is a new starter with a laptop, docking station, two monitors and a headset one install, or one install and four adds?

So define a standard IMACD with fixed contents, and name what falls outside it. A workable description:

  • Per workstation, not per device. One workstation with the standard set of accessories is one unit.
  • Including the edges of the job. Disconnecting, moving within the building, reconnecting, testing with the user and updating the register.
  • Excluding what is not a workstation. Installing network points, extending a switch, fitting out a meeting room: that is a small project with its own order.
  • A threshold to project. Above an agreed number of workstations in one go, it becomes a relocation project with a plan and its own proposal, not a pile of separate IMACDs.

Three ways to put IMACD in a contract

There are three common forms, and they suit different organisations:

  • Included up to a volume. An agreed number of IMACDs per period is part of the fixed fee for workplace management, with an agreed rate above it. Suits organisations with predictable staff turnover.
  • Per item. Each IMACD is charged separately at a fixed rate per type. Clear when changes are rare, but you pay for travel every time if nothing is bundled.
  • Per project. Large moves and rollouts get their own proposal. Under the other two forms, that is also the rule above the threshold.

What drives the price, whichever form you choose: whether the work can be done remotely or needs a site visit, the distance to the site, whether it happens inside or outside office hours, how much is done at once, whether the equipment has been prepared in advance, and how standardised the workstations are. An estate with one laptop model and one standard build makes every IMACD shorter.

Lead times and scheduling

Because an IMACD is planned work, it carries a lead time rather than a response time: how many working days between a complete request and a working workstation. Agree it per type, because issuing from stock is not the same as moving someone to another site.

  • What makes a request complete. Name, start date, location, which kit and who approved it. A request without a location costs a day of chasing.
  • Batching per site. Collecting IMACDs per site and having them done on fixed days means less travel and an engineer who knows the location.
  • Urgent as the exception. Define what an urgent IMACD is, who may ask for one and on what terms. Otherwise everything becomes urgent.
  • Stock. A short lead time for a new starter only works if prepared equipment is on the shelf. Agree who holds that stock.

Every IMACD is a change to the asset register

The most valuable part of an IMACD is the least visible. After every install, move or disposal, the register is only right if someone updates it: which device, which serial number, which user, which location. Skip that and after a year the register is a guess, and a guess does not help with an audit, an insurance claim or a refresh plan.

So agree that an IMACD is only closed once the register has been updated, and have that shown in the monthly report. The same goes for licences: an add or a disposal often changes who uses which licence, and a licence tied to a disposed laptop keeps being paid for.

The D: disposal is more than taking it away

Disposing of a device is only done when four things have happened:

  • The data has been wiped, with a certificate per serial number, or the storage has been destroyed. A device holding personal data that leaves unwiped is a data breach.
  • The device is out of management: out of MDM, out of automated enrolment, out of monitoring and backup. Otherwise it keeps reappearing as missing.
  • Licences and accounts are released, and a leased device goes back on the terms of the lease.
  • The equipment is handled responsibly: reuse where possible, and otherwise recycling under the WEEE rules.

Physically moving a whole site is a different story from a single IMACD; how we handle that is on our page about IT installation and relocation.

Where our work stops

What we do. We carry out IMACDs with our own local engineers on site, in every country: installing, moving, extending, changing and disposing of workstations, including testing with the user, updating the register and wiping data with a certificate per serial number. We also lay data cabling and mount equipment. We are ISO 9001, ISO/IEC 27001 and ISO 14001 certified.

What we do not do. We are not a removal company: furniture, filing cabinets and staff belongings are moved by a removals firm. We are not a building contractor: electrical circuits, walls and other building work belong with an electrician or contractor. And we do not decide who gets which device; that is your organisation’s policy, and we carry it out.

Frequently asked

Questions we get about this

The five that come up most often.

What does IMACD stand for?

IMACD stands for Install, Move, Add, Change and Dispose. It is the umbrella term for planned workplace work where someone physically has to do something, such as issuing a new laptop or moving a desk. In a workplace contract it usually appears as a separate service.

What is the difference between IMAC and IMACD?

IMAC is the older form, without disposal. IMACD explicitly includes disposing of equipment: wiping data with a certificate, taking the device out of management, releasing licences and recycling responsibly. If your contract says IMAC, ask how disposal is handled.

Is an IMACD an incident or a service request?

A service request. Nothing is broken and the work can be scheduled, so it carries a lead time rather than an incident response time. Logging an IMACD as an incident pollutes the fault figures and gives planned work an urgency it does not have.

What determines the cost of an IMACD?

Mainly whether the work can be done remotely or needs a site visit, the distance, whether it happens inside or outside office hours, how many IMACDs are done at once and how standardised the workstations are. What one unit includes also counts, and that belongs in the contract. Large moves get their own proposal.

Do you also move furniture and archives?

No. We move, install and test the IT: workstations, monitors, printers and network equipment. Furniture, filing cabinets and personal belongings are moved by a removals company, and building work such as electrical circuits belongs with an electrician or contractor.

Related services

Further reading

What IMACD connects to in a contract.

Shall we make your IMACD clause concrete?

Send us what your workplace contract currently says about changes. We will show what one IMACD should include and where the threshold to a project lies.

Practical IT knowledge in your inbox

New guides on management, security and the workplace, written by the people doing the work. No sales talk, and you can unsubscribe in one click.

We use your address for the newsletter only. See our privacy policy.

Request a quote Call